Editing
Plant Concept
(section)
Jump to navigation
Jump to search
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Technical implementation == The basic technical implementation is as follows: Material reception and material processing (conditioning), thermal area with a WGL 2-50 (two Waste Gasification Lines) with gas treatment and electricity generation area. Conveyors are used to transport the accumulated and collected residual materials to the material preparation area of the plant, where they are pre-conditioned in accordance with the process requirements. This is followed by thermochemical treatment in the two gas lines. The combustible and engine-compatible fuel gas produced is then converted into electricity in gas Otto engines and ORC systems. The plant concept includes all main and auxiliary units required for proper operation as well as all storage tanks for operating and auxiliary materials. The design and installation are carried out in accordance with the applicable regulations and standards for the construction and operation of such a plant. The interfaces are:
Summary:
Please note that all contributions to ewgruppe.net may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Ewgruppe.net:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Navigation menu
Personal tools
Not logged in
Talk
Contributions
Log in
Request account
Namespaces
Page
Discussion
British English
Views
Read
Edit
Edit source
View history
More
Search
Navigation
Login
Tools
What links here
Related changes
Special pages
Page information